The Agile Tribe

The path to Agile

Author: Susan Akers

 Two of the most common questions I get asked as the Agile Academy Advisor are:

“How can I start my Agile journey? 

What type of training can I get?” 


 So I thought perhaps it was about time that I put something together in one spot to make it easy for people to see a clear path ahead of them and feel confident in moving to an Agile way of working.  One way to see what training might be useful is to have a look at our role based Training Roadmap and then read the course overview to make sure that you have the necessary pre-requisites.  The roadmap shows the recommended courses and pathway.

The Agile Academy has also produced a number of artefacts to complement our training courses and give budding Agilists an opportunity to have open access to easy to understand material.  These include our Agile in Practice Help Sheets which cover a number of Agile practices and techniques.  Most of these also have a complementary video which explains more about how each of these techniques can be used. 

All the very best on your Agile journey.  Don’t be discouraged if your path becomes a little windy, there are many resources to guide you and if you have any questions at all around Agile or training please feel free to contact us directly.

Advertisements
Leave a comment »

What's your role in an Agile team?

Author: Susan Akers

 This is an issue that many people face working in an Agile team particularly those in the role of Project Managers or Iteration Managers

Common questions around these two roles can be – 

  • Are they the same role?
  • Should the Iteration Manager just be someone from the team?
  • How much time should be spent on being an IM? Full-time/part-time?

To help answer these questions and more, the Agile Academy has produced yet another handy Agile in Practice Help Sheet on Agile Team Roles and an accompanying video of the same name for those who want a bit more information about the difference between being a Project Manager and Iteration Manager; as well as seeing what other roles should be part of the Core Team and Extended Team.

1 Comment »

Agile Q&A: Wording User Stories

Author: Craig Smith

A former colleague contacted me the other day with a question along the lines of: “I am working with some guys who are looking at creating User Stories and there is a lot of discussion about how they should be worded.”
Read the rest of this entry »

Leave a comment »

"Stories drive a stand-up"

Author: Marc Galbraith, Iteration Manager

On a recent project the rather large team came to a consensus that stand-ups they were doing didn’t have the value attached to them they had been expecting. A suggested change in format was, “Let’s just talk about the stories!”.

OK, so we started to talk about the stories on the wall. The first issue that came up was WHERE DO WE START? We soon realised the best place was at the end of the story life-cycle and work backwards from there.

Complete > Sign Off > Test > Dev > Review > Analysis > Scope

  • We would reflect on what we had completed the previous day (Team).
  • Discuss current challenges to Signing Off stories (QA and Business Rep).
  • Issues in Testing would be discussed (QA / Dev).
  • Devs would walk down in priority order each story they are pairing on currently (Devs).
  • Stories that are ready and may need final review are highlighted (BA / QA / Dev).
  • Issues in Analysis discussed (BA).
  • Any new Scope highlighted (Team).

So this approach is driven by two key points, the state and priority of the story. We start from the highest and work to the lowest. In our case the highest priority story is in ‘Complete’ and was the latest addition to that pile. So if you were looking at a Scrum backlog it would simply be the item at the top of the backlog and work down the list.

As the project team is split across Melbourne and Sydney it is performed by each part of the team locally in front of their respective walls. Then twice a week we bring the whole team (approx 25 people) together over video and perform the same stand-up, which we call the ‘National Stand-up’. Just focusing on the stories has made the large stand-up more efficient, informative and productive for the team.

We achieve this over videoconferencing by printing out an electronic version of the wall, as we need to be in a room with dedicated video facilities, and nominate a facilitator to conduct the driving from the printout. At the end, the team walks out of the rooms with a good picture of where they are at overall, and where the focus needs to be.

Having a natural process to the stand-up also enhances the self-managing ethics the team wishes to improve on. It appears to take the guess work out of “What should I cover off at stand-up?”, especially on Mondays when the weekend has had a negative impact on their memory.

Leave a comment »